Chemistry Building Refurbishment

Ongoing Work – Winter 2026-2027

The refurbishment of the Chemistry Building is being carried out in stages – different parts of the building are renovated in different phases to minimize the impact on operations. During winter 2026-2027, work is ongoing in Fysik Trapphuset. Meanwhile, several parts of the Chemisty Building are being finished.

The following major works are taking place in the Chemistry Building and Fysik Trapphuset during winter 2026-2027:

Research Building 1

A new entrance facing the Vasa area, including a new elevator is finished in the beginning of 2027.

Local work is being carried out within the divisions.

Course Building

Work is ongoing on floor 4 with new teaching laboratories and learning environments for basic education.

Work is ongoing on floor 5 with new teching laboratories for basic education.

Local work is being carried out within the divisions.

Research Building 2

Student facilities as well as group rooms and study areas for the basic education are finished on floor 1.

Local work is being carried out within the divisions.

Fysik Trapphuset

Work is ongoing on floor 1 with new group rooms and study areas for the basic education.

Work is ongoing on floor 2 and 3 with new office and lab facilities.